On the 23, 24, 25 and 26, the annual regulatory maintenance of the Transformer Stations that serve the PCB buildings will be carried out. As a result, it will be necessary to shut down the transformers, disconnect them from the mains and run the generators for the duration of the work.

During this period in which work will be carried out with generators, the normal power lines (FN) will be without supply, the preferential power lines (FP) will have occasional outages and the UPS power lines (FS) will operate normally.

You may experience occasional engine noises or smells outside the building during this work as a result of the units being put into operation. We therefore recommend that you keep the windows of your offices and laboratories closed during the work.

Please only switch on the equipment that is absolutely necessary.

Schedule of the disruption:
23 at 6:00 am: R&D+i Towers. Estimated duration 3 hours
24 at 6:00 am: Ground Floor to Roof (Cluster II). Estimated duration 3 hours
25 at 6:00 am: Cluster Offices, Cluster II Basement and Animal House 2 Estimated duration 3 hours
26 at 7:00 am: Cluster I and Helix. Estimated duration 6 hours

Date: 23, 24, 25 and 26 November
Buildings: Cluster I, Cluster II, Cluster Offices, R&D+I Towers, Helix