Replacement of core network equipment

< Back to notices
 26/09/2021  > 02/11/2021

Replacement of core network equipment

On 26 October and 2 November, the main network core equipment will be replaced. This equipment is part of the backbone that provides connectivity to the Internet on the PCB network. The replacement involves the physical dismantling of the current equipment in order to install and configure the new one, which means that connectivity to the Internet will be affected. Installation periods, network impact and affected buildings are as follows:

  • 26 October
    • Affected buildings: Cluster, Cluster 2, Cluster Offices, R+D+I Towers
    • Installation period: from 8 pm on 26 October to 6 am on 27 October
    • Internet outage: expected to be affected from 9 pm to midnight.
    • Possible intermittent outages until the end of the installation (6 am on 27 October)
  • 2 November
    • Affected buildings: Helix
    • Installation period: from 8 pm on 2 November to 6 am on 3 November
    • Internet outage: expected to be affected from 9 pm to midnight.
    • Possible intermittent outages until the end of the installation (6 am on 3 November)