Restoration of the Floor in the Basement of the Clúster I Building from 29 May to 5 June

< Back to notices
 25/05/2023  > 05/06/2023

Restoration of the Floor in the Basement of the Clúster I Building from 29 May to 5 June

On Monday 29 May, we will begin Phase 3 of the restoration of the basement floor, where the painting of the floor and the pedestrian walkways will be carried out. The area affected by floor painting is the walkway to the Clúster I basement, and between modules B3-C3 and B4-C4 (in red on the plan).

To go from the B3-C3 to the B4-C4 modules in the basement you should enter either by the corridor of the waste storerooms or through the stairs that lead to the ground floor.

More information.