On Saturday 27th, the annual regulatory maintenance of the Transformer Station that serves the Cluster I and Helix buildings will be carried out. As a result, it will be necessary to shut down the transformers, disconnect them from the mains and run the generators for the duration of the work.

During this period in which work will be carried out with generators, the normal power lines (FN) will be without supply, the preferential power lines (FP) will have occasional outages and the UPS power lines (FS) will operate normally.

Therefore, we ask you to connect only the equipment that is essential to avoid overloading the generators.

Date: 27 November
Buildings: Cluster I, Helix